How to Prepare for Asphalt Installation — And Why You Should Pave

July 1, 2025

Thinking about installing a new driveway, parking area, or private road? Asphalt paving is one of the most durable, cost-effective solutions available. But before the first layer is poured, proper preparation is key to ensuring a long-lasting, high-quality surface.

Whether you’re searching for asphalt paving or planning your first paving project, this guide will help you understand how to prepare—and why asphalt installation is a smart investment for your property.

Why Choose Asphalt Paving?

Asphalt is the go-to material for homeowners and businesses alike—and for good reason.

1. Durability:
A properly installed asphalt surface can last 15–20 years or more with minimal maintenance.

2. Cost-Effectiveness:
Compared to concrete, asphalt is generally more affordable to install and repair.

3. Fast Installation:
Most asphalt driveways and lots can be installed and ready for use in just 1–2 days.

4. Smooth, Safe Surface:
Asphalt provides a clean, black finish with excellent traction and water drainage.

5. Curb Appeal & Property Value:
A newly paved surface instantly improves the look of your home or business.

How to Prepare for Asphalt Installation

Proper site preparation is essential for a long-lasting asphalt surface. Here’s what to expect during the process:

1. Site Evaluation & Planning

Your asphalt contractor will assess the area to determine slope, drainage needs, and soil stability. Planning ensures the surface will be structurally sound and compliant with local regulations.

2. Excavation & Grading

The existing surface—whether grass, gravel, or old pavement—must be removed. Excavation may go 6–12 inches deep to make room for a solid base. Grading creates the proper slope for drainage.

3. Sub-Base Preparation

A strong, compacted sub-base (often made of crushed stone or gravel) is laid and leveled. This layer supports the weight of vehicles and prevents shifting or sinking.

4. Proof Rolling & Repairs

Contractors may run heavy rollers over the sub-base to identify soft spots. If any are found, they’re dug out and replaced with more stable material.

5. Binder & Surface Layers
Once the base is approved, a binder layer of coarse asphalt is applied. After it’s compacted, the final smooth surface layer is added and rolled for a clean finish.

Aftercare: What to Expect

New asphalt needs time to cure—typically 24–48 hours before use. Avoid parking heavy vehicles or turning wheels in place for the first week. Sealing is recommended within 6–12 months for added protection.